| The Verified Fix Version should be the same as the _______
(1)the sprint
(2)Acual Fix Version for all Preview JIRAS
(3)Actual Fix Version +2 Weeks
(4)Actual Fix Version for all JIRAs in Preview and production, and never lower that the Actual Fix Versions
Answer:-(4)Actual Fix Version for all JIRAs in Preview and production, and never lower that the Actual Fix Versions | | |